Analisis Waktu Dan Biaya Pekerjaan Pembangunan Kontruksi Gedung Lembaga Penjaminan Mutu Pendidikan Tahap II Sulawesi Selatan
DOI:
https://doi.org/10.56326/jptsk.v1i3.3013Keywords:
Analysis Time Schedule, Budget Plan, Building ConstructionAbstract
Estimated Time and Cost of Realizing the Construction Work of the Education Quality Assurance Institute (LPMP) Phase II South Sulawesi. The purpose of this study is to find out all the estimated time and cost of realizing the construction work of the Education Quality Assurance Institution (LPMP) building phase II, South Sulawesi, where this research uses the S curve method with the aim of obtaining credible and valid data from the time schedule. The data collection method is carried out using the RAB method in construction, observation, and documentation projects and the results obtained are processed based on the time schedule made with the estimated time and cost realization design. The results obtained by using the estimated time schedule and realization costs, there is a 6 day time difference between planning and realization time, while the cost difference is Rp.1,506.414.776.12. from the planning budget Rp.42,492,268,405.01
References
Asnuddin, S., Tjakra, J., & Sibi, M. (2018). Penerapan Manajemen Konstruksi Pada Tahap Controlling Proyek. Jurnal Sipil Statik Vol.6 No.11, 6(11), 895906.
Atssauri, Fathul, Sofyan. (2016). Analisis Anggaran dan Realisasi Proyek Sebagai Alat Perencanaan dan Pengendalian Biaya Proyek pada PT. Brantas Abipraya (Persero) di Jombang. Skripsi Universitas Negeri Islam Maulana Malik. http://etheses.uin-malang.ac.id/10500/
A.A.Sri.A. 2014. Produktivitas Tenaga Kerja Dan Alat Untuk Pekerjaan Struktur Beton Pada Kontruksi Gedung Di Denpasar Dan Badung. (Tugas Akhir Tidak Dipublikasikan, Jurusan Teknik Sipil Fakultas Teknik Universitas Udayana).
Arnelia, B, 2013. Analisa Produktivitas Tenaga Kerja Dalam Kaitannya Terhadap Waktu Dan Pelaksanaan Proyek Kontruksi. Tugas Akhir, Program Studi Teknik Sipil Fakultas Teknik Universitas Udayana, Denpasar.
Ervianto,W. I. 2002. Manajemen Proyek Konstruksi. Andi, Yogyakarta.
Erick, F. M. 2012. Analisis Cash Flow Optimal Pada Kontraktor Proyek Pembangunan Perumahan. Jurnal Sipil Stati. Vol. 1 No. 1, Hal 60-64.
Harry, H. 2019. Edisi 3 Manajemen Kontruksi (Perencanaan dan Pengendalian Proyek). ISTN, Jakarta.
Husen, A. 2010. Manajemen Proyek, Andi Yogyakarta, Serpong.
Iman,. 2015. Manajemen Proyek (Dari Konseptual Sampai Operasional). Edisi 4. Erlangga, Jakarta.
Juansyah, Y., Oktarina, D., & Zulfiqar, M. (2017). Analisis perbandingan Rencana Anggaran Biaya bangunan menggunakan metode SNI dan BOW (Studi kasus: Rencana Anggaran Biaya bangunan gedung Kwarda Pramuka Lampung). Teknik Sipil, Fakultas Teknik Universitas Malahayati, 1(1), 1-5.
Jufriyanto, M., & Fathoni, MZ (2019). Manajemen Pengembangan Proyek Apartemen Rungkut Tower dengan Pendekatan Critical Path Method dan Pert. Jurnal Internasional Sains, Teknik, Dan Teknologi Informasi, 03(02), 144146. https://journal.trunojoyo.ac.id/ijseit%0AProject
Kiswati, S., & Chasanah, U. (2019). Analisis Konsultan Manajemen Konstruksi Terhadap Penerapan Manajemen Waktu Pada Pembangunan Rumah Sakit Di Jawa Tengah. Neo Teknika,
(1). https://doi.org/10.37760/neoteknika.v5i1.1367
Lalmi, A., Fernandes, G., & Souad, SB (2021). Model manajemen proyek hibrida konseptual untuk proyek konstruksi. Ilmu Komputer Procedia, 181(2019), 921930. https://doi.org/10.1016/j.procs.2021.01.248.
Martinus, 2016. Penerapan Metode Cpm Pada Proyek Konstruksi (Studi Kasus Pembangunan Gedung Baru Kompleks Eben Haezar Manado). Jurnal Sipil Statik. Vol. 4 No. 9, Hal 551-558.
Maryam, dkk. 2013. Pengendalian Waktu Dan Biaya Pekerjaan Konstruksi Sebagai Dampak Dari Perubahan Desain. Jurnal Teknik Sipil. Vol. II, No. 2.
Santosa, Budi. 1997. Edisi 3 Manajement Proyek, Edisi Pertama, PT Guna Widya, Jakarta.
Sudi,.K.M. 2018. Analisa Harga Satuan Pekerjaan Pada Kontruksi Gedung Dengan Metode Bow SNI Dan Lapangan. Universitas Islam, Yogyakarta.
Mark, C. 2012. Pendekatan Analisa Koefisien Tenaga Kerja Dan Bahan Untuk Pekerjaan Beton Cor. Tugas Akhir, Program Studi Teknik Sipil Fakultas Teknik Universitas Udayana, Denpasar
Simatupang, J. S dkk, 2015. Pengaruh Percepatan Durasi Terhadap Waktu Pada Proyek Konstruksi (Studi Kasus: Pembangunan Persekolahan Eben Haezar Manado). Jurnal Sipil Statik. Vol. 3 No. 5. Hal 281-280.
Sedarmayanti, 2015. Sumber Daya Manusia Dan Produktivitas Kerja, CV. Mandar Maju, Bandung.
Downloads
Published
Issue
Section
License
Copyright (c) 2023 Dalvin Mangiri, Natsir Abduh, Sayitri Prasandi
This work is licensed under a Creative Commons Attribution 4.0 International License.