Studi Perencanaan Pipa Penstock Pada Pembangunan PLTA Poso
DOI:
https://doi.org/10.56326/jptsk.v1i3.3014Keywords:
Penstock Pipe, Poso Hydroelectric Power Plant, DamAbstract
Development of water through the construction of dams where development has a goal to improve the quality of all aspects of people's lives, namely social, cultural and economic aspects in order to realize social welfare. The implementation of a dam construction project that requires more expertise to complete the final work, always requires a project completion time and that has been specified in the work contract. The active role of management is one of the main keys to the success of project management in achieving targets in terms of cost, quality and time. In the construction of this dam requires an implementation method which includes: preparatory work (land clearing and stripping, mobilization, work roads, making board directors, and project nameplates, building facilities and infrastructure for office buildings, workshop warehouses, and providing clean water and lighting, and connecting roads from the highway to the project site.), construction of evasion channels, excavation of soil and used to make upstream and downstream cofferdams. The Poso River that flows from Lake Poso to generate electricity With an average discharge of 148 m3 per second, its energy potential is enormous. PT Poso Energy has 3 concessions for hydroelectric power plants on the river with a total of 600 MW
References
Afrian Firnanda, dkk. 2016. Analisis Stabilitas Bendung Tamiang. Jom FTEKNIK Volume 3 no. 2 Oktober 2016
Anonim; 2010 Laporan Studi Kelayakan Pembangunan PLTA Koko Putih, PT. 00-Nusantara Indo Energi, Jakarta. Internet; Sharma K.N. Dandekar. M.M; 1991, Pembangkit Listrik Tenaga Air, UI-press, Jakarta.
Bambang Triatmodjo, 2006. Hidrologi Terapan. Beta Offset, Yogyakarta.
Berlian Mahendra, I Made Mara, Yesung Allo Padang, 2013. Perancangan pipa pesat, dan daya keluaran pembangkit listrik tenaga air koko putih desan bilok petung kecamatan sembalun kabupaten lombok timur. Mataram, NTB.
Binsal Silitonga, dkk 2018. Perencanaan Hidrolis Pintu pada Bangunan Pengambilan Air (intake). Jurnal Rekayasa Konstruksi Mekanika Sipil Vol. 1 No. 2 Agustus 2018.
Dede Idam Setiawan, 2014. Rancang Bangun Simulator Pembangkit Listrik Tenaga Mikrohidro(PLTMH). Universitas Pendidikan Indonesia. Bandung.
Fariski Afdalindra Ihsan, dkk, 2017. “Analisis Perencanaan Bendung Sei Laset Daerah Irigasi Simandolak Kabupaten Kuantan Singingi Jom FTEKNIK Volume 4 No.2 Oktober 2017
Meri Indah Sari, 2020. Perencanaan Pembangkit Listrik Tenaga Air (PLTA) di Bendungan Leuwikeris Tasikmalaya, Yogyakarta
Robert Sinurat, 2020. Peracncangan Pipa Pensctock dan turbin pada PLTMH Curug Cilember Bogor, jawa barat.Teknologi dan bisnis energi Institut Teknologi PLN. Jakarta.
Sulistianto, Asmaruddin, Mega Sherly Suljiati, 2019. Perencanaan pola Operasi bendung Poso-1 dalam menopang fungsi PLTA Poso 515 MW sebagai pembangkit Peaker. Makassar.
Downloads
Published
Issue
Section
License
Copyright (c) 2023 Alawiyah Chaerunisa Alhabsyi, Burhanuddin Badrun, Andi Rumpang Yusuf
This work is licensed under a Creative Commons Attribution 4.0 International License.