Studi Perencanaan Pipa Penstock Pada Pembangunan PLTA Poso

Authors

  • Alawiyah Chaerunisa Alhabsyi Program Studi Teknik Sipil, Fakultas Teknik, Universitas Bosowa
  • Burhanuddin Badrun Program Studi Teknik Sipil, Fakultas Teknik, Universitas Bosowa
  • Andi Rumpang Yusuf Program Studi Teknik Sipil, Fakultas Teknik, Universitas Bosowa

DOI:

https://doi.org/10.56326/jptsk.v1i3.3014

Keywords:

Penstock Pipe, Poso Hydroelectric Power Plant, Dam

Abstract

Development of water through the construction of dams where development has a goal to improve the quality of all aspects of people's lives, namely social, cultural and economic aspects in order to realize social welfare. The implementation of a dam construction project that requires more expertise to complete the final work, always requires a project completion time and that has been specified in the work contract. The active role of management is one of the main keys to the success of project management in achieving targets in terms of cost, quality and time. In the construction of this dam requires an implementation method which includes: preparatory work (land clearing and stripping, mobilization, work roads, making board directors, and project nameplates, building facilities and infrastructure for office buildings, workshop warehouses, and providing clean water and lighting, and connecting roads from the highway to the project site.), construction of evasion channels, excavation of soil and used to make upstream and downstream cofferdams. The Poso River that flows from Lake Poso to generate electricity With an average discharge of 148 m3 per second, its energy potential is enormous. PT Poso Energy has 3 concessions for hydroelectric power plants on the river with a total of 600 MW

References

Afrian Firnanda, dkk. 2016. Analisis Stabilitas Bendung Tamiang. Jom FTEKNIK Volume 3 no. 2 Oktober 2016

Anonim; 2010 Laporan Studi Kelayakan Pembangunan PLTA Koko Putih, PT. 00-Nusantara Indo Energi, Jakarta. Internet; Sharma K.N. Dandekar. M.M; 1991, Pembangkit Listrik Tenaga Air, UI-press, Jakarta.

Bambang Triatmodjo, 2006. Hidrologi Terapan. Beta Offset, Yogyakarta.

Berlian Mahendra, I Made Mara, Yesung Allo Padang, 2013. Perancangan pipa pesat, dan daya keluaran pembangkit listrik tenaga air koko putih desan bilok petung kecamatan sembalun kabupaten lombok timur. Mataram, NTB.

Binsal Silitonga, dkk 2018. Perencanaan Hidrolis Pintu pada Bangunan Pengambilan Air (intake). Jurnal Rekayasa Konstruksi Mekanika Sipil Vol. 1 No. 2 Agustus 2018.

Dede Idam Setiawan, 2014. Rancang Bangun Simulator Pembangkit Listrik Tenaga Mikrohidro(PLTMH). Universitas Pendidikan Indonesia. Bandung.

Fariski Afdalindra Ihsan, dkk, 2017. “Analisis Perencanaan Bendung Sei Laset Daerah Irigasi Simandolak Kabupaten Kuantan Singingi Jom FTEKNIK Volume 4 No.2 Oktober 2017

Meri Indah Sari, 2020. Perencanaan Pembangkit Listrik Tenaga Air (PLTA) di Bendungan Leuwikeris Tasikmalaya, Yogyakarta

Robert Sinurat, 2020. Peracncangan Pipa Pensctock dan turbin pada PLTMH Curug Cilember Bogor, jawa barat.Teknologi dan bisnis energi Institut Teknologi PLN. Jakarta.

Sulistianto, Asmaruddin, Mega Sherly Suljiati, 2019. Perencanaan pola Operasi bendung Poso-1 dalam menopang fungsi PLTA Poso 515 MW sebagai pembangkit Peaker. Makassar.