Pengaruh Manajemen Material Terhadap Produktivitas Kerja Pada Pekerjaan Pembangunan Mall Pelayanan Publik Gowa
DOI:
https://doi.org/10.56326/jptsk.v3i1.4265Keywords:
Produktivitas Kerja, Manajemen Material, Manajemen Konstruksi, Material, Regresi Linear BergandaAbstract
Low labor productivity in a construction project can have a negative impact, such as causing project delays so that the project is not completed on time, therefore this study aims to identify factors in material management that affect labor productiveness. The type of research used is a quantitative approach with the survey method and analyzed with the double linear regression analysis operated with the Statical Program for Social Science (SPSS) program. The double lineary regression is used to trace patterns of relationships between bound variables with two or more free variables. Based on the regression model obtained the output value of F sig. 0,000 smaller than 0.05 stated that material delivery, material usage, material storage and Quality Control together (simultaneously) influence the (Y) productivity variable. The factor that has the most dominant influence on the productivity of the project is the Material Delivery Variable (X1) with a significance of 0.001 with a R-square value of 0.428 which means 42.8% of the influence of X1 on Labor Productivity (Y) and the Material Usage Variabel (X2) signifying value of 0,000 with the R-Square of 0.557 which means a large 55.7% of the impact of X2 on Labor Produktivity. (Y).
References
Chandra, Y. N. R., Basuki, M., Fariya, S., Teknik, J., & Itats, P. (2017). Sistem Manajemen Material Pada Pembangunan Kapal Baru Di Pt. Adiluhung Saranasegara Indonesia.
Eny Suhardiyani, P., Putu Widyarsana, I., & Kadek Sri Ebtha Yuni, N. (2011). Analisis Pengaruh Manajemen Material Terhadap Kualitas Kinerjapelaksanaan Proyek Konstruksi Gedung Di Kota Denpasar. Jurnal Ilmiah Mitsu (Media Informasi Teknik Sipil Universitas Wiraraja), 10(1), 41–52.
Farhani, S., & Fathur Rouf Hasan, M. (2022). Analisis Perbandingan Produktivitas Pekerjaan Struktur Beton Bertulang Berdasarkan Koefisien Lapangan Dengan Peraturan Menteri Pupr No. 1 Tahun 2022.
Hernandi, Y., & Tamtana, J. S. (2020). Faktor-Faktor Yang Mempengaruhi Produktivitas Pekerja Pada Pelaksanaan Konstruksi Gedung Bertingkat. In Jmts: Jurnal Mitra Teknik Sipil (Vol. 3, Issue 2).
Jumliati. (2016). Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Industri Roti Maros Di Kabupaten Maros.
Labombang, M., & Qamaria, S. (2012). Infrastruktur Manajemen Penggunaan Material Pada Pekerjaan Tanggul Sungai Pondo-Poboya Use Of Material On The Management Works Embakment Pondo’s River-Poboya.
Mulyadi. (2015). Sistem Akuntansi (4th Ed.). Salemba Empat.
Pranomo, Y., Mulyani, R. E., & Lusiana. (2014). Rancangan Sistem Manajemen Material Pada Proyek Pembangunan Perluasan Hotel Mercure 8 Lantai. Jelast: Jurnal Teknik Kelautan, Pwk, Sipil, Dan Tambang, 1(1).
Prihantoro, C. R. (2012). Konsep Pengendalian Mutu. Remaja Rosdakarya.
Purnama, D. J., Manulang, V., & Bus, M. (2014). Prosedur Penyimpanan Di Gudang Pt. Y Maintenance Facility. Jurnal: Industri Elektro Dan Penerbangan, 4(3).
Purwanto. (2010). Peran Investor Asing Dalam Sektor Jasa Konstruksi Di Indonesia. Jurnal Ekonomi Dan Pembangunan, 18(1), 49–66.
Nugroho, P. S. (2012). Peningkatan Produktivitas Konstruksi Melalui Pemilihan Metode Konstruksi Improvement Of Construction Productivity Through Construction Method Selection. 8(1), 25–30.
Siswanto, A. B., & Salim, M. A. (2019). Manajemen Proyek (H. Ibdah, Ed.). Cv. Pilar Nusantara.
Tamin, R. Z. (2013). Pengembangan Pasar Dan Daya Saing Industri Konstruksi Nasional.
Wirayudha, S., Pribadi, T. W., & Arif, S. (2017). Perancangan Aplikasi Berbasis Android Untuk Aktivitas Manajemen Material Galangan Kapal Baru. Jurnal Teknik Its, 6(2), G140–G145..
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Ahmad Ashar, M. Natsir Abduh, Eka Yuniarto

This work is licensed under a Creative Commons Attribution 4.0 International License.