Alternatif Perancangan Jembatan Pelengkung Struktur Atas Jembatan Tawaeli Menggunakan Sistem Jembatan Pelengkung Steel Box Tipe Through Arch Birdge
DOI:
https://doi.org/10.56326/jptsk.v3i2.4951Keywords:
Jembatan Pelengkung, Through Arch Bridge, Steel Box, Program FEM, PerancanganAbstract
The bridge, a structural construction used to cross gaps or obstacles like rivers, railroads, or highways, is essential in infrastructure. Replacing Tawaeli I Bridge is part of the government’s initiative to improve road and bridge infrastructure in Indonesia. Tawaeli I Bridge has nearly reached its planned lifespan and thus requires replacement. The current concrete bridge design includes piers within the river flow, which creates issues, especially during the rainy season when rising water levels and carried debris risk damaging the piers. This study focuses on designing a replacement for Tawaeli I with an upper arch bridge structure using a Steel Box Through Arch Bridge system. The new bridge, spanning 80 meters in length and 10 meters in width, is designed without piers in the river, allowing unobstructed flow. It includes longitudinal IWF 500.200.10.16 girders, transverse IWF 900.500.24.36 girders, D 55 mm freyssinet hangers, an arch Box 1100.1000.50.50, and tension Box 1000.900.50.50. This design uses FEM structural software to analyze the structure and internal forces.
References
Angga Hidayat, R., & Suharyatma, dan. (2021). Studi Variasi Tinggi Busur Pada Perencanaan Ulang Jembatan Sardjito II Terhadap Pengaruh Perilaku Dan Kekuatan Through Arch Bridge. https://dspace.uii.ac.id/handle/123456789/37144
Bayu, L, T., & Suswanto, B. (2017). Modufikasi Struktur Jembatan Musi Iv Dengan Menggunakan Sistem Box Half Through Arch. https://repository.its.ac.id/42836/1/3115105048-Undergraduate_Theses.pdf
Bhayu, R, G., Erma D., & Euneke W. (2021) Analisis Dinamik Jembatan Pelengkung (Studi Kasus: Jembatan Palu IV). 01 Cover 222015154.pdf (itenas.ac.id)
Budiarto B., Bachtiar, E., Setiawan, A. (2020). Perencanaan Balok T Konversional Pada Superstruktur Jembatan. JATS, 2 (1), Juli, 2020. https://journal.unifa.ac.id/index.php/JATS/article/view/210.
Freynssinet Sustainable Technology. (2024). Tetron CD Mechanicka Hrncova Loziska. www.freyssinet.cz.
Hidayat, R. A., Sarwidi & Suharyatma. (2019). Studi Variasi Tinggi Busur Pada Perencanaan Ulang Jembatan Sardjito Ii Terhadap Pengaruh Perilaku Dan Kekuatan Through Arch Bridge. https://dspace.uii.ac.id/handle/123456789/14023?show=full
Kusnan. (2017). Analisa Perencanaan Struktur Atas Jembatan Pelengkung. Jurnal Ilmiah Teknik Sipil, 01, 01, 2017. 2252-5009. https://static-fip.unesa.ac.id/index.php/23
Sariman, S., & Setiawan, A. (2024). Pembimbing “Alternatif Perancangan Jembatan Pelengkung Struktur Atas Jembatan Tawaeli Menggunakan Sistem Jembatan Pelengkung Steel Box Tipe Through Arch Bridge”.
Standar Nasional Indonesia. (2020). Tentang Spesifikasi Untuk Bangunan Gedung Baja Struktural (SNI 1729:2020). Badan Standar Nasional: Jakarta.
Standar Nasional Indonesia. (2016). Tentang Pembebanan Untuk Jembatan (SNI 1725:2016). Badan Standar Nasional: Jakarta.
Standar Nasional Indonesia. (2005). Tentang Perencanaan Struktur Baja Untuk Jembatan (RSNI T-03-2005). Badan Standar Nasional: Jakarta.
William, T, S. (2013). Steel design, (5tf ed). Stamford CT:Cengage Learning..
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Suardi Palmabas, Syahrul Sariman, Eka Yuniarto

This work is licensed under a Creative Commons Attribution 4.0 International License.







